Basic HTML Version
Table of Contents
| SPECIAL CONSIDERATIONS WHENREPLACING CIRCUIT BOARDS | 2 |
| INSTALLATION | 4 |
| INSPECTION | 4 |
| POWER TURN-ON AND GAME SETUP | 4 |
| BOOKKEEPING AND GAME EVALUATION | 6 |
| GAME ADJUSTMENT PROCEDURE | 6 |
| RESETTING HIGH SCORE TO DATE | 7 |
| FACTORY AUDIT TOTALS | 7 |
| DIAGNOSTIC PROCEDURES | 9 |
| INITIATING AUTO-CYCLE MODE | 14 |
| CPU BOARD SELF-TEST | 14 |
| DRIVER BOARD | 15 |
| CPU Board Assembly Drawing | 19 |
| Driver Board Assembly Drawing | 23 |
| Driver Board Logic Diagram | 28-29 |
| Sound Board Assembly Drawing | 36 |
| Master Display Board Assembly Drawing | 45 |
| PLAYER SLAVE DISPLAY | 47 |
| CREDIT/MATCH SLAVE DISPLAY | 49 |
| Playfield Switch Wiring Diagram | 55 |